How many days you need to install the equipment?

2024-09-11

The dyeing machine will be assembled and tested before leaving the factory. Small ones can be made into an integrated skid-mounted type, and large ones will be disassembled into several parts. After arriving at the factory, just connect them according to the connection diagram, and connect the water, electricity and gas before use.